| | Preface | | |
| | Acknowledgements | | |
| | The conference sponsors | | |
| | Opening address by Viscount Ullswater | | 1 |
1 | | An engineers perspective on legislative changes by J. M. Anderson | | 7 |
2 | | Bone necrosis by D. N. Walder | | 16 |
3 | | Decompression illness by D. H. Elliott | | 29 |
4 | | Controlled caisson sinking - design and performance on Contract 4 of the Greater Cairo Wastewater Project by J. L. Vincett and F. N. Rowley | | 41 |
5 | | The use of compressed air at Lake Lothing, Lowestoft by J. G. Campbell and D. R. Gutteridge and A. P. Smith | | 61 |
6 | | Compressed air tunnelling for the Hong Kong Mass Transit Railway by J. G. Campbell and D. R. Gutteridge | | 75 |
7 | | Use of compressed air for shaft sinking and tunnelling on Contracts 3, 12 and 12/5A of the Greater Cairo Wastewater Project, Egypt by D. J. Court | | 91 |
8 | | Oakwood Beach Interceptor Sewer: a compressed air tunnel case history by R. J. Angarola and S. K. Jain and C. C. Chang | | 118 |
9 | | A preliminary survey of quantitative risk factors for bone necrosis in British compressed-air workers by A. Evans | | 139 |
10 | | The role of intramedullary pressure in hyperbaric osteonecrosis by E. H. Lanphier and C. E. Lehner and S. E. Lemos | | 148 |
11 | | Optimum schedules for caisson decompression by E. P. Kindwall | | 156 |
12 | | Early pathogenesis of hyperbaric osteonecrosis by C. E. Lehner and T. F. Lin and E. H. Lanphier and M. A. Wilson and R. Dueland and P. R. Dubielzig | | 172 |
13 | | Report of seventeen cases with delayed occurrence of dysbaric osteonecrosis by L.-D. Zhang and J.-F. Kang and H. Zhang | | 188 |
14 | | Compressed air tunnelling between Somerset Station and Newton Station, Singapore by A. R. Gaba and D. B. Parkes | | 199 |
15 | | Estimation of compressed air losses by R. S. Hoad and G. P. Gittoes | | 224 |
| | More... | | |